Find the most up-to-date version of API RP 12R1 at Engineering Production Service. API RECOMMENDED PRACTICE 12R1. FIFTH EDITION, AUGUST EFFECTIVE DATE: OCTOBER 1, American. If you have any questions or comments regarding API standards, please visit RP 12R1. Recommended Practice for Setting, Maintenance, Inspection.

Author: Negrel Guk
Country: Germany
Language: English (Spanish)
Genre: Art
Published (Last): 25 November 2005
Pages: 437
PDF File Size: 1.22 Mb
ePub File Size: 10.83 Mb
ISBN: 574-1-73841-788-3
Downloads: 51412
Price: Free* [*Free Regsitration Required]
Uploader: Yozshugami

American Petroleum Institute – Recommended Standards and Practices

Therefore, a comment to the OMB on the proposed information collection requirements is best assured of having its full effect if the OMB receives it by October 30, This rule also identifies certain specific acts of noncompliance that may result in an immediate assessment and provides a process for the Bureau of Land Management BLM to ro variances from the requirements of this rule.

It includes provisions intended to ensure that oil and gas produced from Federal and Indian oil and gas leases are properly and securely handled, to ensure accurate measurement, production accountability, and royalty payments, and to prevent theft and loss.

Send your comments on this proposed rule to the BLM on or before November 6, As explained later, the BLM is also requesting that the Office 12rr1 Management and Budget OMB extend the control number for the 24 information collection activities that would continue in r; proposed rule.

The proposed rule expands the acts of noncompliance that would result in an immediate assessment under the existing regulations. Immediately after the Waste Prevention Rule was issued, petitions for judicial review of the Rule were filed by industry groups and States with significant BLM-managed Federal and Indian minerals.

It’s easy to join and it’s free. If you wish to comment on the information collection requirements in this proposed rule, please note that the OMB is required to make a decision concerning the collection of information contained in this proposed rule between 30 and 60 days after publication of this proposed rule in the Federal Register.

A comment to the OMB on the proposed information collection revisions is best assured of being given full consideration if the OMB receives it by March 26, The document promulgated new regulations to reduce waste of natural gas from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian other than Osage Tribe leases. It includes provisions intended to ensure that oil and gas produced from Federal and Indian except Osage Tribe oil and gas leases are properly and securely handled, so as to ensure accurate measurement, production accountability, and royalty payments, and to prevent theft and loss.

The section you are viewing is cited by the following CFR sections.

API RP 12R1-2008

After reconsidering the cost, complexity, and other implications of the final rule, the BLM is now proposing to revise the final apl in a manner that reduces unnecessary compliance burdens, is consistent with the BLM’s ali statutory authorities, and re-establishes long-standing requirements that the final rule replaced. Purchase includes yearly addenda to the current edition of the standard. The final rule is effective on January 17, Corrosion rateli fe of tank components willv ary widely with location, environment, service, typoef fluid, and corrosion mitigation techniques elected by the ownedoperator.

  LIVRO DISPOSITIVOS SEMICONDUTORES DIODOS E TRANSISTORES EM PDF

Cornell Law School Search Cornell. This document reopens the comment period for the proposed rule gp to site security Order 3 and extends the comment period for the proposed rule pertaining to oil measurement Order 4.

API – Standards

Like Order 5, this rule establishes minimum standards for accurate measurement and proper reporting of all gas removed or sold from Federal and Indian except the Osage Tribe leases, units, unit participating areas Wpiand areas subject to communitization agreements CAs. Order 3 establishes minimum standards for oil and gas facility site security. Summary The Bureau of Land Management BLM is promulgating new regulations to reduce waste of natural zpi from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian other than Osage Tribe leases.

Register now while it’s still free! Thickness for Tank Elements thread This recommended 121 s intended primarily for application to tanks fabricatedt o API Specifications1 2F3, D, F, and P sometimes called the API 12 serinie sth is document when employed in on-land production service; but 12r basic principles are applicablet o atmospheric tanks of other dimensions and specifications when they are employed a;i similar oil and gas production, treating, and processing services.

As spi later, the proposed rule would establish new information collection requirements that must be approved by the Office of Management and Budget OMB. Unless connected to a vapor recovery or flare system, all tanks must have a pressure-vacuum relief valve installed at the highest point in the vent line or connection with another tank. The BLM intends to hold three public meetings on December 1, 3, and 8,tp accept public comment on the proposed rules.

Thank you for helping keep Eng-Tips Forums free from inappropriate posts. Digital Transformation may be defined in a number of different ways by analysts or enterprise software vendors. It establishes minimum standards for the measurement of oil produced from Federal and Indian except Osage Tribe leases to ensure that production is accurately measured and properly accounted for.

This document corrects several minor errors that were introduced by the Office of the Federal Register during formatting, as well as one erroneous cross-reference, in the text of the final rule.

The operator must accurately calibrate each oil storage tank associated with an approved FMP that has a tank-gauging system using either API 2. The Bureau of Land Management BLM is proposing new regulations to reduce waste of natural gas from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian leases.

  CALCULOS ESTEQUIOMETRICOS EXERCICIOS RESOLVIDOS PDF

Spec 12B, Bolted Tanks for Storage of Production Liquids, 14th Edition, February Covers material, design, and erection requirements for vertical, cylindrical, aboveground, bolted steel tanks in nominal capacities of to 10, barrels in standard sizes for production service.

On February 8,the Bureau of Land Management BLM published in the Federal Register a proposed rule that would reduce waste of natural gas from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian leases. Send your comments on this proposed rule to the BLM on or before October 9, The Eng-Tips staff will check this out and take appropriate action.

Students Click Here Join Us! Thickness for Tank Elements thread Forum. Title 43 published on Oct The BLM need not consider, or include in the administrative record for the final rule, comments that it receives after the close of the comment period or comments delivered to an address other than those listed below see ADDRESSES. The BLM is rescinding the novel requirements pertaining to waste-minimization plans, gas-capture percentages, well drilling, well completion and related operations, pneumatic controllers, pneumatic diaphragm pumps, storage vessels, and leak detection and repair LDAR.

Send your comments on this proposed rule to the BLM on or before April 23, Am I missing something or are they poorly written? Send your comments on this proposed rule to the BLM on or before April 8, Customers who bought this product also purchased Spec 10A, Well Cements, 22nd Edition, January Covers requirements for manufacturing eight classes of well cements; includes chemical and physical requirements; and physical testing procedures.

Suggested solutions to the immediate design and economic and safety problems involved in pressure-relieving discharge systems are presented. Download Now Defense manufacturing is all about project manufacturing and project accounting. Finally, it sets forth a process for the BLM to consider variances from the requirements of this proposed regulation. Applies to tanks with internal pressures approximating atmospheric pressure, but higher pressure is permitted when additional requirements are met.

This rule strengthens the BLM’s policies governing production verification and accountability by updating and replacing the existing requirements of Order 3 to address changes in technology and industry practices that have occurred in the 25 years since Order 3 was issued, and to respond to recommendations made by the Government Accountability Office GAO and the Office of the Inspector General OIG with respect to the BLM’s production verification efforts.

StdWelded Steel Tanks for Oil Storage, 10th Edition, October Covers material, design, fabrication, erection, and testing requirements for aboveground, vertical, cylindrical, closed- and open-top, welded steel storage tanks in various sizes and capacities.